The 2019 Streets project was completed by the end of May 2019 and was performed by Long's Asphalt, Inc. The project consisted of milling, grading, base repair and overlay of portions of the following streets.
N. Cherry Lane from Valley Road to Smith Street
Smith Street
Eagleton Drive
Woodland Drive (2 portions)
General Maintenance and Repair of Borough Streets in 2019 will occur by the end of July. This typically addresses potholes and crack sealing, and on occasion may include inlet, curbing and other repairs.
Jacobus Borough 126 N. Cherry Lane • Jacobus, Pennsylvania 17407-1000 Phone (717) 428-1752 • Fax (717) 428-0588 • Email: jacobusborough@verizon.net